[1] R. P. Hoskins, A. T. Brint, and G. Strbac, “A structured approach to Asset Management within the electricity industry,” Util. Policy, Vol. 7, No. 4, pp. 221–232, 1999.
[2] H. Wang, “A survey of maintenance policies of deteriorating systems,” Eur. J. Oper. Res., Vol. 139, No. 3, pp. 469–489, 2002.
[3] D. I. Cho and M. Parlar, “Invited Review A survey of maintenance models for multi- unit systems,” Eur. J. Oper. Researc, Vol. 51, pp. 1–23, 1991.
[4] A. Rahman, “Maintenance contract model for complex asset/equipment,” Int. J. Reliab. Qual. Saf. Eng., Vol. 21, No. 1, pp. 1–11, 2014.
[5] M. Tantardini, A. Portioli-Staudacher, and M. Macchi, “A model for considering the impact of rescheduling planned maintenance activities in a maintenance service contract,” Prod. Plan. Control, Vol. 25, No. 3, pp. 241–259, 2014.
[6] D. R. Godoy, R. Pascual, and P. Knights, “A decision-making framework to integrate maintenance contract conditions with critical spares management,” Reliab. Eng. Syst. Saf., Vol. 131, pp. 102–108, 2014.
[7] B. Susanti, R. D. Wirahadikusumah, B. W. Soemardi, and M. Sutrisno, “Impact of Performance Based Contract Implementation on National Road Maintenance Project to Road Functional Performance,” Appl. Mech. Mater., Vol. 845, pp. 364–368, 2016.
[8] H. Haapasalo, A. Aapaoja, S. Björkman, and M. Matinheikki, “Applying the choosing by advantages method to select the optimal contract type for road maintenance,” Int. J. Procure. Manag., Vol. 8, No. 6, pp. 643–665, 2015.
[9] J. M. Lozano and M. Sánchez-Silva, “Improving decision-making in maintenance policies and contract specifications for infrastructure projects,” Struct. Infrastruct. Eng., Vol. 15, No. 8, pp. 1087–1102, 2019.
[10] S. Abdul Hadi, M. R. Al Kaabi, M. O. Al Ali, and H. A. Arafat, “Comparative Life Cycle Assessment (LCA) of streetlight technologies for minor roads in United Arab Emirates,” Energy Sustain. Dev., Vol. 17, No. 5, pp. 438–450, Oct. 2013.
[11] O. M. Arafa and A. A. Mansour, “Economic study of replacing conventional ballast with electronic ballast for high pressure sodium lamps used in public lighting in Egypt,” J. Electr. Syst. Inf. Technol., Vol. 2, No. 1, pp. 120–132, May 2015.
[12] A. A. Mansour and O. A. Arafa, “Comparative study of 250W high pressure sodium lamp operating from both conventional and electronic ballast,” J. Electr. Syst. Inf. Technol., Vol. 1, No. 3, pp. 234–254, 2014.
[13] M. Bebbington, C. Lai, and R. Zitikis, “Lifetime analysis of incandescent lamps: The Menon-Agrawal model revisited,” THEORY Appl., Vol. 1, No. 1990, pp. 97–108, 2008.
[14] M. Banejad and H. Ijadi, “High impedance fault detection : Discrete wavelet transform and fuzzy function approximation,” J. AI Data Min., Vol. 2, No. 2, pp. 149–158, 2014.
[15] A. Ghaffari and S. Nobahary, “FDMG: Fault detection method by using genetic algorithm in clustered wireless sensor networks,” J. AI Data Min., Vol. 3, No. 1, pp. 47–57, 2015.
[16] M. J. Mirzaei, R. Dashti, A. Kazemi, and M. H. Amirioun, “An asset-management model for use in the evaluation and regulation of public-lighting systems,” Util. Policy, Vol. 32, pp. 19–28, Mar. 2015.
[17] M. J. Mirzaei, M. H. Amirioun, A. Kazemi, and R. Dashti, “Optimal contracting strategies for public-lighting asset management:A case study from Iran,” Util. Policy, Vol. 64, p. 101048, Jun. 2020.
[18] T. K. Yaakov Bar-Shalom, X. Rong Li, Estimation with Applications to Tracking and Navigation. John Wiley Sons, 2001.
[19] Vossloh-Schwabe Deutschland GmbH., “Technical Details – Components for Discharge Lamps.” .
[20] E. Ignitors, “Ignitors and Accessories for Discharge Lamps SUPERIMPOSED , PULSE AND INSTANT RESTRIKE.” “vialox NAV-E,” 2017.